Rosemount 975 Cone Viewer

Part number975 Cone ViewerManufacturerEmerson

No product images are published for this product yet.

Purchase options

$357.61

Availability
Call for availability Originalx

Independent supplier

Sproh is an independent supplier and is not an authorized distributor or official representative of Rosemount or Emerson.

Overview

Sighting attachment for the 975 flame detectors that shows where the cone of vision actually falls, for commissioning and coverage checks.

Key features

  • Cone viewer for the Rosemount 975 flame detectors: a sighting attachment that shows where the cone of vision actually falls
  • Used at commissioning to verify aim, and on site by designers to check that a layout's coverage exists in the steel
  • Fitted envelope from drawing 00975-7003: 4.75 in [120.6 mm] x 5.42 in [137.7 mm] x 7.44 in [189.0 mm]
  • Optical and mechanical only - it does not connect to the fire and gas system and adds no electronics
  • Does not replace the built-in test or a flame simulator functional test; it answers whether the detector is aimed at the right place
  • Normally bought once per site rather than once per detector

Key specifications

Accuracy
Shows the detector's actual cone of vision so the published coverage can be checked against the installation; field of view is 100 x 95 degrees on bare IR3 and UV/IR models and 70 degrees when a duct mount or air shield narrows the aperture
Output signal
None - the viewer adds no electronics and does not connect to the fire and gas system
Diagnostics
Answers the third commissioning question: the built-in test proves the window is clear and a flame simulator proves the detector responds, while the cone viewer proves it is looking at the right place
Pressure range
Not applicable - optical and mechanical viewing attachment with no process connection
Variants
Drawing 00975-7003, Model 975 Flame Detector with Cone Viewer; fitted envelope 4.75 in [120.6 mm] x 5.42 in [137.7 mm] x 7.44 in [189.0 mm]
Application
Commissioning new 975 installations and surveying existing ones after a modification moved a pipe or added a walkway, plus on-site design verification of a coverage layout
See all specifications