Rosemount 9935 Level Bypass Chamber
Purchase options
Request a quote
- Availability
- Call for availability Originalx
Configurable — choose options to build the exact part number.
Independent supplier
Sproh is an independent supplier and is not an authorized distributor or official representative of Rosemount or Emerson.
Overview
Level bypass chamber for external mounting of radars and switches: Class 2500, ASME B31.3, live instrument maintenance and a stilling well.
Key features
- Level bypass chamber (bridle) for externally mounting level instruments on a vessel, rated to ASME B16.5 Class 2500 and designed to ASME B31.3 with B31.1 available
- The instrument moves off the vessel, so it can be isolated and serviced live while the process keeps running - the difference between a radar on a nozzle and a radar on a chamber with two isolating connections
- A chamber gets bought for one of three separate reasons: in-tank constraints such as an agitator or heat exchanger bundle, isolation for live maintenance and hazardous liquids, or turbulence where the chamber acts as a stilling well
- Once the instrument is on the chamber it measures the chamber, not the vessel: a blocked lower connection traps liquid and freezes the reading, and a blocked upper connection disconnects the vapour space so the indicated level drifts with temperature
- Drain and optional vent exist so the column can be emptied, flushed and refilled deliberately rather than by hope, and both belong in the commissioning procedure and the periodic check
- Weld neck flanges throughout and all welds full penetration, specified to reduce stress and crevice corrosion - the failure mode that matters in a small pressure boundary nobody inspects inside
Key specifications
- Accuracy
- Not a measuring device. It is the enclosure that makes a level measurement possible, and its success is measured in whether the instrument beside it can be trusted and reached. Once the instrument is on the chamber it measures the chamber, not the vessel, so the chamber's own connections become part of the measurement
- Output signal
- Not applicable - a passive pressure component with process connections, a drain and an optional vent. It accepts Rosemount guided wave radar, non-contacting radar and vertical level switches mounted on its top flange or side connections
- Diagnostics
- Two failure modes belong to the installation rather than the instrument: a blocked lower connection traps liquid in the chamber and freezes the reading at whatever it was last equal to, which is not obviously a fault on an undisturbed vessel; a blocked upper connection disconnects the vapour space, so the pressure above the chamber liquid is no longer the vessel's and the indicated level drifts with temperature. The drain and optional vent exist so the column can be emptied, flushed and refilled deliberately, and both belong in commissioning and in the periodic check
- Pressure range
- Rated for pressures up to ASME B16.5 Class 2500. Weld neck flanges are used throughout to reduce stress concentration, and all welds are full penetration, which the datasheet specifies for integrity and to reduce crevice corrosion - the failure mode that matters in a small pressure boundary nobody inspects from inside
- Application
- Externally mounting a level instrument on a vessel: distillation columns and reactors where a guided wave radar needs a clear path or needs to be removable, horizontal tanks with no room for a top-mounted instrument, vessels with agitators or internal heat exchangers, and any service where the instrument must be serviceable without a shutdown
- Mounting
- Vertical column beside the vessel with two side process connections at different elevations, one top connection for the instrument, and a bottom drain. A custom design service covers nozzle spacing, flange rating and code requirements, because a bridle is frequently a made-to-order pressure component
The instrument is moved out of the vessel so it can be serviced — and the two nozzles become the measurement
The Rosemount 9935 is a level bypass chamber — a bridle — a self-contained column mounted beside a vessel, connected to it by two process connections, with the level instrument mounted on the chamber rather than in the tank. It is rated to ASME B16.5 Class 2500, designed to ASME B31.3 process piping with B31.1 power piping available on request, and built for the Rosemount guided wave radar, non-contacting radar and vertical level switches.
Its central claim is a maintenance one: it allows isolation of the process instrument for live maintenance. That is a bigger statement than it sounds. A radar mounted in a nozzle on a distillation column cannot be removed while the column is running — the nozzle is a hole in a pressure boundary at temperature. Mount the same radar on a chamber with two isolating connections, and it can be taken off, inspected, cleaned or replaced while the vessel continues to operate.
Three different problems, one piece of pipe
The datasheet groups the applications in a way that is worth keeping, because a chamber gets bought for one of three reasons and they do not overlap:
In-tank constraints. An agitator, a heat exchanger bundle or internal trays leave no clear vertical path for a radar — the instrument would be looking at a paddle or a coil rather than a surface. A chamber provides a clear column outside all of it.
Isolation. Live maintenance, safety, hazardous liquids, and high pressure or temperature. The instrument is behind valves rather than behind a nozzle.
Turbulence. The chamber acts as a stilling well: the vessel can be boiling, foaming or being stirred, and the column beside it presents a comparatively calm surface. This is the same reason a dual-chamber magnetic indicator is used with guided wave radar — the radar gets something steady to measure.
One chamber can serve more than one of those, which is why the specification is worth thinking through as a set of requirements rather than as a part number.
The two connections are the measurement
Once the instrument is on a chamber, it is no longer measuring the vessel — it is measuring the chamber, and the chamber is only representative if its connections are clear and its vapour space is connected.
That gives two failure modes that belong to the installation rather than to the instrument:
A blocked lower connection traps liquid in the chamber. The level stops responding and reads whatever it was last equal to — and a level that has stopped changing is not obviously a fault, particularly on a vessel that is not being disturbed.
A blocked upper connection disconnects the vapour space, so the pressure above the liquid in the chamber is no longer the pressure above the liquid in the vessel. The indicated level then depends on the difference between them, which drifts with temperature and with whatever is happening in the vessel.
Which is why the chamber carries a drain and an optional vent: the drain allows the column to be emptied and flushed, and the vent allows gas in the upper zone to be released so that the chamber can be refilled and equalised deliberately rather than by hope. Treat both as part of the commissioning procedure and as part of the periodic check, not as fittings that exist in case of emergency.
The pressure boundary, and why the welds are specified
A chamber is a pressure vessel's annexe: it sees the same pressure, often the same temperature, and unlike the vessel it is small enough that nobody inspects its inside.
The 9935 uses weld neck flanges throughout, which reduces stress concentration compared with a slip-on or socket weld, and all welds are full penetration. The datasheet gives the reason directly: increased integrity and reduced crevice corrosion. A partial-penetration weld leaves a gap at its root, and in a chamber carrying chlorides or sour service that gap is where corrosion starts and where no inspection can see it.
Class 2500 availability is the other half of that argument. The chamber is not the cheap alternative to a nozzle — at high pressure it is the part that has to be built properly, and it is the reason the datasheet mentions a custom design service: a bridle is frequently a made-to-order pressure component with the vessel's nozzle spacing, the instrument's process connection and the site's code stamped into it.
Where it fits
Distillation columns and reactors where a guided wave radar needs a clear path or needs to be removable; horizontal tanks where a top-mounted instrument has no room; vessels with agitators or internal heat exchangers; and any service where the level instrument must be serviceable without a shutdown, or where the process is too turbulent for a direct measurement.
It is not a measuring device — it is the enclosure that makes one possible, and its success is measured in whether the instrument beside it can be trusted and reached. That makes the ordering conversation about nozzle spacing, flange rating, code, drain and vent, and where the isolation valves go — not about level technology at all.
Manufacturer reference: Rosemount 9935 Level Bypass Chamber Product Data Sheet 00813-0100-4435 for the chamber ordering options, process connections, pressure ratings, code compliance, drain and vent options and dimensions.
Specifications
| Attribute | Value |
|---|---|
| Accuracy | Not a measuring device. It is the enclosure that makes a level measurement possible, and its success is measured in whether the instrument beside it can be trusted and reached. Once the instrument is on the chamber it measures the chamber, not the vessel, so the chamber's own connections become part of the measurement |
| Output signal | Not applicable - a passive pressure component with process connections, a drain and an optional vent. It accepts Rosemount guided wave radar, non-contacting radar and vertical level switches mounted on its top flange or side connections |
| Diagnostics | Two failure modes belong to the installation rather than the instrument: a blocked lower connection traps liquid in the chamber and freezes the reading at whatever it was last equal to, which is not obviously a fault on an undisturbed vessel; a blocked upper connection disconnects the vapour space, so the pressure above the chamber liquid is no longer the vessel's and the indicated level drifts with temperature. The drain and optional vent exist so the column can be emptied, flushed and refilled deliberately, and both belong in commissioning and in the periodic check |
| Pressure range | Rated for pressures up to ASME B16.5 Class 2500. Weld neck flanges are used throughout to reduce stress concentration, and all welds are full penetration, which the datasheet specifies for integrity and to reduce crevice corrosion - the failure mode that matters in a small pressure boundary nobody inspects from inside |
| Application | Externally mounting a level instrument on a vessel: distillation columns and reactors where a guided wave radar needs a clear path or needs to be removable, horizontal tanks with no room for a top-mounted instrument, vessels with agitators or internal heat exchangers, and any service where the instrument must be serviceable without a shutdown |
| Mounting | Vertical column beside the vessel with two side process connections at different elevations, one top connection for the instrument, and a bottom drain. A custom design service covers nozzle spacing, flange rating and code requirements, because a bridle is frequently a made-to-order pressure component |
| Operating temperature (°C) | Set by the chamber material, flange rating and code compliance selected for the application, with ASME B31.3 process piping as standard, ASME B31.1 power piping on request and NACE construction available. The chamber sees the same pressure and often the same temperature as the vessel it serves |
| Measuring range | Not applicable. The chamber's span is set by the distance between the lower connection and the top flange, which is what defines the measuring range of the instrument mounted on it |
Accessories and related items
Accessories and related items for this product are not available to order on Sproh yet. If the manufacturer lists them, an engineer can source them for you.
Ask an engineer