Field services
Installation
Installation has one test: the instrument as built must match the instrument as designed, and where it does not, the difference must be recorded rather than absorbed.
Mounting is what decides whether a measurement survives its first season. A bracket that moves in wind, an enclosure that traps water or a lens aimed at a hot surface will degrade a correct design.
The other half is the record. An as-built that shows positions, heights, circuits and deviations is what lets the next person service the system without repeating the survey.
How installation runs
Pre-installation check
Confirm mounting points, cable routes, isolation, permits and site readiness before anything is fixed.
Mechanical work
Fit supports and enclosures at the surveyed positions and heights, leaving access for later service.
Power and network
Run and terminate supply and communications, protect the entries, and record every circuit and address used.
Commission
Power up, confirm communications, compare first readings with expectation and clear the health flags.
Hand over the as-built
Issue positions, heights, addresses, photographs and any deviation from the design.
What handover includes
- As-built positions and mounting details.
- Circuit, address and network records.
- Commissioning results and outstanding items.
- A deviation list against the design.