Field services
Site survey
A survey is the evidence base for every later decision. Its output is a record of the site as it is, including what could not be established on the day.
A survey is not a sales visit. It records the facts a layout, a mounting detail and a cable route depend on, and it keeps observation separate from inference.
Held to that standard, a survey is worth more than its drawings: it tells design which questions are answered and which remain open.
How the survey is carried out
Boundary and release inventory
Walk the plot; record which assets hold gas, in what phase, and which boundary edges adjoin third-party land.
Geometry and confinement
Record heights, roof lines, walls and obstructions that decide where gas travels and where it collects.
Wind reference
Establish where an anemometer can stand, what it represents and how far that is from the monitored area.
Constraints
Map power, network, access, zoning and hot-work limits that decide where work is possible.
The survey record
Deliver drawings, photographs, the assumption list and the open questions design has to close.
What the survey delivers
- A marked plot plan with the monitored area and its boundary.
- A release inventory by asset, phase and gas.
- The wind reference position and what it represents.
- A constraint map and an explicit list of assumptions.