Skip to content
MetIQGas intelligence

Field services

Retrofit

A retrofit is constrained work. The station stays in service, the existing safety function stays in place, and the new monitoring has to fit around both.

Most stations were not built with a spare cable route, a spare breaker or a spare panel. A retrofit starts by establishing what exists and what can be shared before deciding what to add.

The rule that keeps it safe is that new monitoring is additive. It does not replace the existing gas detection or its alarm logic without a separately agreed change.

How a retrofit is scoped

  1. Assess what exists

    Record the installed detection, its coverage and how it is documented, including where the drawings no longer match.

  2. Decide what stays

    Separate the instruments worth keeping from those that cannot join a continuous scheme, and say why.

  3. Plan the interfaces

    Establish power, signal, network and enclosure capacity, and what must be added to support new devices.

  4. Install alongside

    Fit new devices without interrupting the existing function, recording every connection made.

  5. Verify against the old

    Compare the new record with the existing system where they overlap, so a discrepancy surfaces at handover.

Constraints a retrofit meets

  • No spare power or panel capacity.
  • No obvious cable route through an operating plant.
  • Hazardous-area limits on what may be installed.
  • Documentation that no longer matches the site.

Continue reading